久久免费视频观看,最新国产福利在线,av毛片在线看,久久久精品在观看999,人人爽人人看,国产久热香蕉在线观看,国产精品99精品久久免费

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.